Our goods are made by present day computerized equipment and tools. We offer you OEM service. We can supply a full-range of power transmission merchandise like chains, sprockets and plate wheels, pulleys, gearboxes, motors, couplings, gears and racks.
RV series Characteristics
- RV – Sizes:030-040-050-063-075-105-one hundred ten-130-one hundred fifty
- Enter Choices: with input shaft, With Square flange,With Enter Flange
- Enter EPT .06 to 11 kW
- RV-Dimensions from 030 to a hundred and five in die-solid aluminium alloy budy and more than one hundred ten in cast iron
- Ratios in between 5 and one hundred
- Max torque 1550 N.m and admissible output radial loads max 8771 N
- Aluminium units are supplied total with synthetic oil and let for EPT mounting positions, with no need to modify lubricant quantity
- Worm wheel: Copper (KK Cu).
- Loading ability in accordance with: ISO 9001:2015/GEPT/T 19001-2016
- Dimension 030 and more than are painted with RAL 5571 blue
- Worm gear EPTs are accessible with diffferent combinations: NMRV NMRV, NMRVEPT NMRV, JWEPT NMRV
- NMRV, NRV VS,NMRV AS,NMRV VS,NMRV F
- Choices: torque arm, output flange, viton oil seals, minimal/substantial temperature oil, filling/drain/breather/stage plug,Little gap
EPTasic designs can be utilized to a vast variety of EPT reduction ratios from five to a thousand.
Warranty: One particular calendar year from date of supply.
WORM EPT | |||||
SNW Sequence | Output Velocity Selection: | ||||
Variety | Old Kind | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | phi14 | Relevant Motor EPT: | |
SNW040 | RV040 | 45N.m | phi19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | phi25 | Enter Options1: | |
SNW063 | RV063 | 160N.m | phi25 | With Inline AC Motor | |
SNW075 | RV075 | 230N.m | phi28 | Enter Options2: | |
SNW090 | RV090 | 410N.m | phi35 | With Square flange | |
SNW105 | RV105 | 630N.m | phi42 | Enter Options3: | |
SNW110 | RV110 | 725N.m | phi42 | With Enter Shaft | |
SNW130 | RV130 | 1050N.m | phi45 | Enter Options4: | |
SNW150 | RV150 | 1550N.m | phi50 | With Input Flange |
Starshine Travel
ZheJiang Starshine Generate Co.,Ltd,the predecessor was a point out-owned army mould EPTrprise, was estabEPTd in 1965. Starshine EPTizes in the complete EPT EPT solution for substantial-stop equipment producing EPT primarily based on the aim of quotPlatform Solution, Application Layout and Skilled Service quot.
Starshine have a powerful complex power with in excess of 350 staff at existing, incXiHu (West Lake) Dis.Hu (West Lake) Dis. in excess of 30 engineering professionals, 30 good quality inspectors, masking an location of 80000 sq. meters and varieties of advanced processing EPTs and screening equipments. We have a excellent foundation for the sector application deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment and services of large-finish pace EPTs amp variators proudly owning to the provincial engineering EPT study cEPTr,the lab of gear pace EPTs, and the foundation of modern R ampD.
Our Group
EPT Management
EPT:Insist on EPTrovement,Strive for Excellence With the deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment of equipment producing indurstry,consumer in no way satirsfy with the existing top quality of our goods,on the opposite,wcreate the value of high quality.
EPT plan:to boost the overall degree in the field of EPT EPT
EPT See:Continuous EPTrovement , pursuit of excellence
EPT Philosophy:EPT creates value
3. Incoming EPT Control
To establish the AQL appropriate degree of incoming substance manage, to provide the materials for the EPT inspection, sampling, immunity. On the acceptance of qualified items to warehousing, substXiHu (West Lake) Dis.Hu (West Lake) Dis.rd merchandise to consider return, verify, rework, rework inspection accountable for monitoring negative, to monitor the provider to take corrective measures
to prevent recurrence.
4. Process EPT Control
The manufacturing website of the very first examination, inspection and closing inspection, sampling in accordance to the needs of some assignments, judging the good quality modify trend
identified irregular phenomenon of production, and supervise the generation section to boost, eliminate the irregular phenomenon or point out.
5. FQC(Closing QC)
Following the manufacturing division will full the merchandise, stand in the customer’s placement on the concluded merchandise top quality verification, in order to ensure the good quality of
client anticipations and wants.
6. OQC(Outgoing QC)
Soon after the merchandise sample inspection to decide the experienced, making it possible for storage, but when the concluded solution from the warehouse just before the official delivery of the merchandise, there is a examine, this is referred to as the cargo inspection.Verify content material:In the warehouse storage and transfer position to affirm, whilst confirming the supply of the item
is a solution inspection to figure out the certified goods.
EPT
Shipping